Installation
All our spandrel panels will arive on site on our own transport, offloading facilities will be required on site due to safe working load restrictions.
The customer is responsible for off loading the vehicle of its contents and should make sure all safety procedures are followed and any air bags etc. are on site if needed.
Included with your delivery will be a panel layout drawing labelling each individual panels location.We also provide section drawings showing how the panels work to your building drawing.
Please adhere to our drawing at all times, if a change to the design is needed please contact us so we can check all calculations to ensure what you intend to do is correctly engineered.
